Quality & Certification

A number beats
an adjective.

Seven control points between the furnace and the loading dock, each with a record that can be pulled by batch. Where we rely on a partner — coating, heat treatment — it is stated as a partner, not implied as our own floor.

Control points

Where defects are actually caught.

Inspection at the end of the line only sorts good parts from bad ones — it does not make good parts. These seven points sit where a defect can still be corrected without scrapping the batch.

01

Incoming material

Pig iron, scrap and alloy checked before the furnace. Charge composition is recorded per heat, not per day.

02

Melting

Spectrum analysis on every heat, inoculation controlled and logged. Carbon equivalent outside the window is corrected before pouring.

03

Moulding & cores

Sand strength and moisture, core position and venting. A shifted core shows up as wall thickness variation — checked before the pour.

04

Cast inspection

Visual for cold shuts, misruns, sand inclusion and shrinkage; dimensional check on the sample; hardness on the test bar.

05

Machining

First piece checked against the drawing before the run continues. Gauges are on the floor, not locked in an office.

06

Final & CMM

Full-dimension first article on every new part number, CMM print on critical features, records filed by batch.

07

Packing & loading

Quantity, marking and protection checked before the container is sealed. Photographs of the load kept on file.

Note

Coating is a partner line

Powder coating, e-coating and urethane coating run through a fixed qualified supplier. Adhesion and salt-spray reports are filed per batch, and the partner is named at audit.

Certification

What we can prove on paper.

Certificate / statusHeld by
ISO 9001 quality management systemGroup
National High-Tech EnterpriseYilong
2025 Hubei Provincial Manufacturing Champion (single product)Yilong
Xianning Hidden ChampionYilong
Wuhan Equity Exchange listing (2015)Yilong
Pollution discharge permit and EIA acceptanceBoth sites

Certificates are available as scans on request. Where a status has a validity period, we send the current certificate rather than the original announcement.

Coordinate measuring machine
Coordinate measuring room. First-article reports are issued from here for every new part number.
Targets

Written as numbers, confirmed on samples.

Targets are set per product family and confirmed against the sample before volume. If a target is not reachable on your geometry, we say so at quotation rather than after the first shipment.

±2%
Kettlebell weight
±1.5% for competition spec.
±0.005mm
Bore position
Verified on CMM, not by hand gauge.
100%
Weighed & sorted
Free weights, piece by piece.
1/batch
Traceable record
Heat, inspection and packing together.
Containment

And when something does go wrong.

No foundry has a zero-defect year. What matters is what happens in the week after you find the problem — and whether the answer arrives before your production line stops.

Our stated sequence: acknowledge within one working day, quarantine the batch at both ends, identify whether the cause is process, tooling or coating, then agree the disposition in writing — replacement, price adjustment or return. The judgement method and who carries the cost are agreed in the contract, before the first order, not after the first complaint.

Ask for a sample report →

Day 1

Acknowledge, ask for photos and batch numbers, stop shipment of the same lot.

Day 2–3

Pull the heat and inspection record, check the retained sample, isolate the cause.

Day 3–5

Written disposition with a replacement or credit plan and a date.

After

Process or tooling change recorded in the part file, so the fix survives the next batch.

Documents

Ask for the certificate, the CMM print or the heat record.

Tell us which part number and which document. If it exists, it is a scan away; if it does not exist yet, we will say that instead of sending something approximate.